Pond Spillway Design and Construction
A field guide to pond spillways: principal and emergency spillway design, NRCS design storm and freeboard criteria, earth spillway geometry, and the details that keep a dam from overtopping.

Progress Payments and Retainage
A contractor's guide to getting paid on earthwork: schedule of values, AIA G702 and G703 pay applications, stored materials, retainage, lien waivers, and change orders.

Concrete Pavement Construction
A field guide to building jointed plain concrete pavement: slab thickness and joint spacing, subgrade support, dowel and tie bars, saw-cut timing, and curing.

Compacting Asphalt Pavement
The paver sets the shape, but in-place density decides how long an asphalt pavement lasts, so compaction is a sequence of temperature, roller pattern, and joint discipline rather than a number of passes.

Water Main Pressure Testing and Disinfection
A new water main has to hold pressure and sample clean before it goes into service, and both gates depend on restraint, air removal, controlled chlorination, real flushing, and a leakage number that is measured rather than assumed.

Storing Heavy Equipment for the Off-Season
An idle machine degrades faster than a working one, so off-season storage is a sequence: clean and inspect, stabilize the fluids, protect the rods and batteries, block the load, and check it every month.